Loading...
HomeMy WebLinkAbout0120622-Electric (wire garage) e OSHKOSH ON THE WATER Job Address 657 BOWEN ST CITY OF OSHKOSH No 120622 ELECTRIC PERMIT - APPLICATION AND RECORD Owner JOHN M CLEAVER Create Date 06/23/2006 Contractor HOMEOWNER Category 612 - Residential-Single Family Addition/R Plan Service o New o Change o Temp . N/A Type 0 Overhead o Underground Volts Amps Circuits Luminaires Switches Receptacles Appliances Use/Nature of FRI Razing existing garage & building a new detached garage* 22' x 20' with a concrete approach to the existing driveway. Work ingel ckt. wiring for garage-lights and receptacles. Contractor to make final connection. Fees: Valuation Issued By: 4~ $500.00 Plan Approval $0.00 Permit Fee Paid $25.00 Date 7/19/2006 D Permit Voided I Parcelld # 1102040000 The undersigned, in applying for an Electric Permit to perform electrical work within a single family home, owned and occupied as the principle residence by the undersigned, hereby acknowledges per City Municipal Code Section 11-22, that other individuals may not be employed to assist with the work described in this permit unless said individuals are licensed by the City of Oshkosh to perform said work. In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any c sary approvals before starting such activity. Date ;;J~~ Signature Agent/Owner Address OSHKOSH WI 5490 - 4630 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.