Loading...
HomeMy WebLinkAbout0120583-Plumbing (sump pump) o OSHKOSH ON THE WATER Job Address 1706 WESTERN ST CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 120583 Contractor M P KELLY Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Owner TROY BECK Create Date 07/10/2006 Category 410 - Residential-Interior Plan Wait. St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Shamp Sink '_ FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rac Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs ISFR / REPLACE SUMP PUMP Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1211120000 Valuation $394.00 Plan Approval Issued By SrYl '--t ) $0.00 Permit Fees $25.00 0 Permit Voided I Date 07/18/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 665 N MAIN ST Agent/Owner OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.