HomeMy WebLinkAbout0120574 B
"'
o
OSHKOSH
ON THE WATER
Job Address 600 N MAIN ST
CITY OF OSHKOSH No 120574
BUILDING PERMIT - APPLICATION AND RECORD
Owner PRIME TABLE L TO Create Date 07f18/2006
Designer
Contractor
OWNER
256 - Parking Lots, Driveways
Plan
Category
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq.Ft.
Sq.Ft.
Rooms
Height
Ft.
D Projection I
Canopies
. Finished/Living
Bedrooms
Stories
Garage
Sq.Ft.
Baths
Signs
Foundation
o Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
. Other
Occupancy Permit Not Required
Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature 'Restaurant / Expand parking lot into aquired SE lot. Add a 14x60 concrete patio to front of restaurant, install a 4' tall decorative fence
of Work laround the patio.
Plumbing Contractor
HVACContractor
Electric Contractor
Fees: Valuati
$8,200.00 Plan Approval
$0.00 Permit Fee Paid
$81.00 Park Dedication
$0.00
Issued By:
Date 07/18/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0401770000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any neces~pprovals before starting such activity.
Signature '7" ~ . Date 7- l g-'- ;;.6'
AgenUOwner
Address 600 N MAIN ST
OSHKOSH
WI 54901 - 4443 Telephone Number 232-1606
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.