HomeMy WebLinkAbout0120600-Plumbing (toilet)
e
OSHKOSH
ON THE WATER
Job Address 215 E GRUENWALD AVE
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner THOMAS A1BARBARA V KAUFMANN
Category 410 - Residential-Interior
Contractor D R GLAZE PLUMBING
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Shower Water Softner Wait. St. Shamp Sink,
Floor Drain Local Waste Ice Chest FlrlWst Sink
Lndry Tray Clothes Wshr Exam Sink Catch Basin
1 Disposal Bidet Sculry Sink Wash Ftn
Dishwasher Beer Tap Hand Sink Urinal
Sump Pump Lab Sink Plaster Sink Standp Rec
Classrm Sink Sterilizer Surgeons Sink Ice Maker
Breakrm Sink Dip Well F Prep Sink Gar Drain
Ejector/Grind Drink Ftn Serv Sink Soda Disp
No 120600
Create Date 07/18/2006
Plan
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
SFR / REPLACE TOILET 'check #4038
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1503470000
Plan Approval
$0.00
$25.00 0 Permit Voided I
Valuation . ~.oo
Issued BY:) m
Permit Fees
Date 07/18/2006
.
In the performance of this work, I agree to perform all work pursuant to rules governing. the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 1865 JAMES RD
OSHKOSH
WI 54904 - 0000 Telephone Number 920-589-4014
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.