Loading...
HomeMy WebLinkAbout0120576-Plumbing (tub) e CITY OF OSHKOSH OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 922 CONCORDIA AVE No 120576 Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Owner TERENCE C REINKE ETAL Create Date 07/10/2006 Category 410 - Residential-Interior Plan Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Contractor PETERS MECHANICAL INC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Issued By LATE PERMIT/BATHROOM REMODEL DUE TO WATER DAMAGE Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1310230000 $1,000.00 $0.00 $25.00 0 Permit Voided I Plan Approval Permit Fees Date 07/18/2006 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holde €lfI6. ecure any necessa rovals efore starting such activity. Signatur AgenUOwner OMRO WI 54963 - 0000 Telephone Number HOME 685-2694 Bot Date? - / cf - o-l- Address 1421 S WEBSTER AVE To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.