Loading...
HomeMy WebLinkAbout0120553-Plumbing (laterals) e OSHKOSH ON THE WATER Job Address 359 KNAPP ST CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner DEL TRITT CONSTRUCTION LLC Contractor COATS, KEITH Category 401 - Residential-Exterior (laterals) Bathtub Shower Water Softner Wait. St. Shamp Sink Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Toilet Disposal Bidet Sculry Sink Wash Ftn Res. Sink Dishwasher Beer Tap Hand Sink Urinal Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Roof Drain Ejector/Gri nd Drink Ftn Serv Sink Soda Disp Misc. Fixtures Use/Nature Install sewer and water laterals for new SFR. of Work No 120553 Create Date 07/17/2006 Plan Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Size Conn. Type New Material Plastic Type Lateral # Sanitary Sewer 4" Storm Sewer 4" Plastic Lateral New .water Service 1" Copper Lateral New Valuation $3,000.00 $0.00 $150.00 D Permit Voided I Plan Approval Permit Fees Issued By In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder nd to se ure a~. necessary approvals before starting such activity. Signature ( t{ Date Agent/Owner Address 8424 SHIRLEY CT WINNECONNE WI 54986 - 9533 Telephone Number 920-582-3975 Parcelld # Date 07/17/2006 ;/- 17-0(:, To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.