Loading...
HomeMy WebLinkAbout0120537-Plumbing (toilet) o OSHKOSH ON THE WATER Job Address 751 VINE AVE CITY OF OSHKOSH No 120537 PLUMBING PERMIT - APPLICATION AND RECORD Owner CONRAD N COSTEllO ETAl Create Date 07/14/2006 Plan Contractor J RASMUSSEN PLUMBING INC Bathtub Whirlpool lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature Replace toilet**DEBIT ACCT of Work Shower Floor Drain lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Category 410 - Residential-Interior Wait. St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Valuation Issued By Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type Parcel Id # 0503460000 $200.00 Plan Approval (fiV $0.00 Permit Fees $25.00 D Permit Voided I Date 07/14/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the CitY strongly urges the permit applicant to contact fhe easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 1914 GREENBRIAR TRl Agent/Owner OSHKOSH Date WI 54904 - 0000 Telephone Number 920-233-6747 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.