HomeMy WebLinkAbout0120508-Plumbing (kitchen)
o
OSHKOSH
ON THE WATER
Job Address 1545 ARBORETUM DR #117
CITY OF OSHKOSH
No
120508
PLUMBING PERMIT - APPLICATION AND RECORD
Owner DAVID W/MARY ELLEN KURTZ
Contractor JIM'S PLUMBING & HEATING INC
Bathtub Shower Water Softner
Whirlpool Floor Drain Local Waste
Lavatory Lndry Tray Clothes Wshr
Toilet Disposal 1 Bidet
-
Res. Sink Dishwasher 1 Beer Tap
Bar Sink Sump Pump Lab Sink
Water Heater Classrm Sink Sterilizer
Site Drain Breakrm Sink Dip Well
Roof Drain Ejector/Grind Drink Ftn
Misc.
Fixtures
Use/Nature Remodel kitchen. "debit acct
of Work
Create Date 07/11/2006
Category 410- Residential-Interior
Plan
Wait. St.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Shamp Sink
FlrlWst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Gar Drain
Soda Disp
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Size
Sanitary Sewer
Storm Sewer
Water Service
Material
Type
#
Conn. Type
Valuation
$3,900.00
$0.00
Parcelld #
1223100000
Plan Approval
Issued By
Permit Fees
$25.00 D Permit Voided I
Date 07/12/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Address W6166 GREENVILLE DR
Agent/Owner
GREENVILLE
Date
WI 54942 - 0000 Telephone Number 920-757-5258
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.