Loading...
HomeMy WebLinkAbout0120508-Plumbing (kitchen) o OSHKOSH ON THE WATER Job Address 1545 ARBORETUM DR #117 CITY OF OSHKOSH No 120508 PLUMBING PERMIT - APPLICATION AND RECORD Owner DAVID W/MARY ELLEN KURTZ Contractor JIM'S PLUMBING & HEATING INC Bathtub Shower Water Softner Whirlpool Floor Drain Local Waste Lavatory Lndry Tray Clothes Wshr Toilet Disposal 1 Bidet - Res. Sink Dishwasher 1 Beer Tap Bar Sink Sump Pump Lab Sink Water Heater Classrm Sink Sterilizer Site Drain Breakrm Sink Dip Well Roof Drain Ejector/Grind Drink Ftn Misc. Fixtures Use/Nature Remodel kitchen. "debit acct of Work Create Date 07/11/2006 Category 410- Residential-Interior Plan Wait. St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Size Sanitary Sewer Storm Sewer Water Service Material Type # Conn. Type Valuation $3,900.00 $0.00 Parcelld # 1223100000 Plan Approval Issued By Permit Fees $25.00 D Permit Voided I Date 07/12/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address W6166 GREENVILLE DR Agent/Owner GREENVILLE Date WI 54942 - 0000 Telephone Number 920-757-5258 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.