Loading...
HomeMy WebLinkAbout0120480-Plumbing (urinal) el CITY OF OSHKOSH OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Addre~;s 2415 WESTOWNE AVE No 120480 Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Owner OSHKOSH GROCERS LLC Create Date 06/29/2006 Category 440 - Industrial-Interior Plan Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Contractor RJ KAMPO PLBG Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature URINAL ADDED TO WORK UNDER PERMIT #118930 of Work Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1621650200 $0.00 Permit Fees $25.00 D Permit Voided I Valuation $500.00 Plan Approval Issued BY~~ W Date 07/11/2006 In the pe,rformance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signatulre Date Agent/Owner APPLETON Address> 1000 S WESTLAND DR WI 54914 - 8862 Telephone Number 730-9600 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone NumbElr. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.