HomeMy WebLinkAbout2006-Plumbing
G
OSHKOSH
ON THE WATER
Job Address 802 VIOLA AVE
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No 120481
Contractor FIELDS PLUMBING
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
1
1
Water Softner
Local Waste
Clothes Wshr
Bidet
Beer Tap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
Owner LINDA A NEMSCHOFF
Create Date 07/06/2006
Category 410 - Residential-Interior
Plan
Wait. St.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Shamp Sink
FlrlWst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Gar Drain
Soda Disp
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
FIXTURES ADDED TO WORK UNDER PERMIT #115561
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1220690000
Issued By
$4,800.00 Plan Approval
$0.00 Permit Fees
$25.00 D Permit Voided I
Valuation
Date 07/11/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure n nece ary approvals before starting such activity.
Signature
Address 1939 SOUTHLAND LN
AgenVOwner
NEW LONDON
Date
:S-u (V (( - Ob
(
WI 54961 - 0000 Telephone Number 920-982-5813
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.