Loading...
HomeMy WebLinkAbout0120477 B e OSHKOSH ON THE WATER Job Address 1325 N MAIN ST CITY OF OSHKOSH No 120477 BUILDING PERMIT - APPLICATION AND RECORD Owner THOMAS RlJUNE JOANIS Create Date 07111/2006 Contractor THD AT-HOME SERVICES INC Designer Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/IBasement Sq. Ft. Rooms Height Ft. D Projection I Finished/Living Sq. Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedicaltion # Dwelling Units o # Structures o Use/Nature ~FR / REPLACE 3 WINDOWS IN THE SAME SIZE AND THE SAME LOCATION, NO STRUCTURAL CHANGES of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,841.00 Plan Approval Issued By: &-YY1 ( ~ $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Date 07/11/2006 FinaIlO.P. 00/00/0000 D Permit Voided I Parcelld # 1501140000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While Ithe City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signatli.lre Date AgenUOwner Address 3200 COBB GALLERIA PKWY STE 200 ATLANTA GA 30339 - 0000 Telephone Number 630-832-4049 To SChEldule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.