Loading...
HomeMy WebLinkAbout0120469-Plumbing (backflow protection) e OSHKOSH ON THE WATER Job Address 1995 S KOELLER ST Contractor KURT ZENTNER & SONS INC CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 120469 Bathtub Shower Water Softner Whirlpool Floor Drain Local Waste Lavatory Lndry Tray Clothes Wshr Toilet Disposal Bidet Res. Sink Dishwasher Beer Tap Bar Sink Sump Pump Lab Sink Water Heater Classrm Sink Sterilizer Site Drain Breakrm Sink Dip Well Roof Drain Ejector/Grind Drink Ftn Misc. CHEMICAL DISPENER Fixtures Owner ALDIINC Create Date 07/10/2006 Category 440 - Industrial-Interior Plan Wait. St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs INSTALL BACKFLOW PROTECTION FOR CHEMICAL DIPENSER AND SERVICE SINK ""DEBIT ACCT Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1307440604 Use/Nature of Work Valuation $200.00 Plan Approval $0.00 Permit Fees Issued By $25.00 0 Permit Voided I Date 07111/2006 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described ill this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 2860 OREGON ST Agent/Owner OSHKOSH Date WI 54902 - 0000 Telephone Number 235-1340 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is.ready.