Loading...
HomeMy WebLinkAbout2006- Building e OSHKOSH ON THE WATER Job Address 2060 WITZEL AVE CITY OF OSHKOSH No 120458 BUILDING PERMIT - APPLICATION AND RECORD Owner WINNEBAGO COMMUNITY CREDIT UNION Create Date 07/10/2006 Designer Contractor FRED J PIETTE CO Category 221 - New Offices, Banks, Professional Plan U3-66-0606 Type . Building o Sign o Canopy o Fence o Raze Class of Const: VBibc Size Rooms Height Ft. o Projection I - Bedrooms Stories Canopies - Baths Signs Zoning C2 Unfinished/Basement Sq.Ft. Finished/Living 3937 Sq.Ft. Sq. Ft. Garage Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature New 3937 sf Credit Union with 960 sf Drive Thru Teller Canopy - Foundation Only. Note: Items 1& 3 of the 4/18/06 Zoning Review shall of Work be approved prior to requesting the Rough Framing Inspection. HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Date 0711 0/2006 Final/O.P. 00/00/0000 ,0 .00 Plan Approval $0.00 Permit Fee Paid $88.00 Park Dedication $0.00 Issued By: o Permit Voided I Parcelld # 0614070000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit pplication within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to u any n appr Is before s g su activity. Date 7-- /tJ-4 Signature Address 3131 W SPENCER ST APPLETON WI 54914 - 4308 Telephone Number 920-739-5733 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.