Loading...
HomeMy WebLinkAbout0120456-Building (fence) '~. OSHKOSH ON THEWATER Job Address 1696 THORNTON DR CITY OF OSHKOSH No 120456 BUILDING PERMIT - APPLICATION AND RECORD Owner SUZANNE L SPANBAUER Create Date 07/10/2006 Designer Contractor OWNER Category 251 - Fences Plan Type . Building o Sign o Canopy Class of Const: o Fence o Raze Zoning Size Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. o Projection I Unfinished/Basement Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature ~FRllnstallation of 48' of 6' high privacy fence per the site plan submitted. .Husband obtained the permit. of Work HV AC Contractor Plumbing Contractor Electric Contmctor Fees: Valuation Issued By: \,ir- $1,000.00 Plan Approval $0.00 Permit Fee Paid $25.00 Park Dedication $0.00 Date 07/10/2006 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 1317440000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) ~nd to secure any ~ecessary ~provals before starting such activity. S;.natu~ 0~ \"'-1: Oa';- ., 1''''/2.0<>'- Agent/Owner Address 696 THORNTON DR OSHKOSH WI 54904 - 8293 Telephone Number To schedlule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless speCified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.