Loading...
HomeMy WebLinkAbout0120444 B e OSHKOSH ON THE WATER Job Address 667 N MAl N ST CITY OF OSHKOSH No 120444 BUILDING PERMIT - APPLICATION AND RECORD Owner BETTY JEAN FINK ETAL Create Date 07/10/2006 Designer Contractor OWNER Category 223 - Alteration Offices, Banks, Professional Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Height Ft. o Projection I Unfinished/Basement Sq.Ft. Sq.Ft. Sq. Ft. Rooms Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation 0 Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier . Other o Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature Dance Studio / Remove rear entrance exterior landing, install granular base and pavement. . Pavement to be installed to meet handicap of Work access requirements. HV AC Contractor Plumbing Contractor Electric Contractor Fe.., va,ua:Jtb Issued By: $2,000.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Date 07/10/2006 Final/O.P. 00/00/0000 o Permit Voided I Parcel Id # 0700830000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easem t, t e City strongly urges the permit applicant to contact the eaSement holder(s) and to se any nec ary appr v s tarting such activity. Date ?;/~~b / , Signature . Address 2024 CRESTWOOD DR OSHKOSH WI 54904 - 9333 Telephone Number COMMERCIAL To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.