Loading...
HomeMy WebLinkAbout0120411 P G OSHKOSH ON THE WATER Job Address 438 N WESTFIELD ST Contractor J RASMUSSEN PLUMBING INC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Issued By CITY OF OSHKOSH No 120411 PLUMBING PERMIT - APPLICATION AND RECORD Shower Floor Drain 4 Lndry Tray 4 Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Hose Bib Owner OSHKOSH AREA SCHOOL DISTRICT Create Date 06/08/2006 Category 440 - Industrial-Interior Plan G2-199-0606-P Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest Flr/Wst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin ExtGrease Trap Bidet Sculry Sink 1 Wash Ftn RPZ Valve - Beer Tap Hand Sink 1 Urinal 2 Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Interior plumbing for new concession stand. Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service. Parcelld # 1608720100 $10,000.00 Plan Approval ~ $0.00 Permit Fees $126.00 D Permit Voided I Date 07/07/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1914 GREENBRIAR TRL OSHKOSH WI 54904 - 0000 Telephone Number 920-233-6747 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.