HomeMy WebLinkAbout0120418-Plumbing (water heater)
o
OSHKOSH
ON THE WATER
Job Address 232 FULTON AVE
CITY OF OSHKOSH No 120418
PLUMBING PERMIT - APPLICATION AND RECORD
Owner CHONG SENG THORlCHA M YANG Create Date 07/07/2006
Category 411 - Residential-Water Heaters
Plan
Contractor JOHN D RANSOM
Shower Water Softner Wait. St. Shamp Sink
Floor Drain Local Waste Ice Chest FlrlWst Sink
Lndry Tray Clothes Wshr Exam Sink Catch Basin
Disposal Bidet Sculry Sink Wash Ftn
Dishwasher Beer Tap Hand Sink Urinal
Sump Pump Lab Sink Plaster Sink Standp Rec
Classrm Sink Sterilizer Surgeons Sink Ice Maker
Breakrm Sink Dip Well F Prep Sink Gar Drain
Ejector/Grind Drink Ftn Serv Sink Soda Disp
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature DUPLEX /232-A / REPLACE GAS WATER HEATER **DEBT KITZ & PFIEL ACCT
of Work
Type
#
Conn. Type
Size
Material
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1000800000
$25.00 0 Permit Voided i
$0.00
Valuation ~.OO
Issued BY~
Plan Approval
Permit Fees
Date 07/07/2006
In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Date
Signature
Agent/Owner
FOND DU LAC
Address W5056 PARADISE LN
WI 54935 - 0000 Telephone Number 920-922-1987
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.