Loading...
HomeMy WebLinkAbout0120425-Building (windows) o OSHKOSH ON THE WATER Job Address 1117 ARTHUR AVE CITY OF OSHKOSH No 120425 BUILDING PERMIT - APPLICATION AND RECORD Owner LANCE WrrRACI L LUFT Create Date 07/07/2006 Designer Contractor WINDOW WORLD OF MILWAUKEE Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Class of Const: Size Rooms Height Ft. o Projection I Bedrooms Stories Canopies Baths Signs Zoning Unfinished/Basement Sq.Ft. Finished/Living Sq.Ft. Garage Sq.Ft. Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature SFR /INSTALLlNG 11 VINYL REPLACEMENT WINDOWS IN SAME SIZE AND LOCATION, NO STRUCTURAL CHANGES of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $3,100.00 Plan Approval Issued By: <z5m 0 $0.00 Permit Fee Paid $46.00 Park'Dedication $0.00 Date 07/07/2006 Final/D.P. 00/00/0000 o Permit Voided I Parcel Id # 1605090000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 235 MORRIS ST FOND DU LAC WI 54935 - 0000 Telephone Number 920-923-4189 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.