HomeMy WebLinkAbout0120430-Plumbing (back flow preventor)
e
OSHKOSH
ON THE WATER
Job Address 1410 ALGOMA BLVD
Contractor O'NEILL ENTERPRISES INC
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner PAINE ART CENTER & ARBORETUM
Category 431 -Industrial-Exterior (other)
Shower Water Softner Wait. St. Shamp Sink
Floor Drain Local Waste Ice Chest Flr/Wst Sink
Lndry Tray Clothes Wshr Exam Sink Catch Basin
Disposal Bidet Sculry Sink Wash Ftn
Dishwasher Beer Tap Hand Sink Urinal
Sump Pump Lab Sink Plaster Sink Standp Rec
Classrm Sink Sterilizer Surgeons Sink Ice Maker
Breakrm Sink Dip Well F Prep Sink Gar Drain .
Ejector/Grind Drink Ftn Serv Sink Soda Disp
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature INSTALL BACK FLOW PREVENTOR FOR LAWN IRRIGATION SYSTEM
of Work
No 120430
Create Date 07/07/2006
Plan
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Size
Type
Conn. Type
Material
#
Sanitary Sewer
Storm Sewer
Water Service
$0.00 Permit Fees
$25.00 0 Permit Voided I
Parcelld #
1200680000
Valuation $500.00 Plan Approval
Issued By ~ W
Date 07/07/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 522 W 6TH AVE
OSHKOSH
WI 54902 - 0000 Telephone Number 920-230-2007
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.