HomeMy WebLinkAbout2006-Building (signs)
e
OSHKOSH
ON THE WATER
JobAdd~ss 201PEARLAVE
CITY OF OSHKOSH No 120402
BUILDING PERMIT - APPLICATION AND RECORD
Owner CITY CENTER ASSOCIATES LLC Create Date 07/05/2006
Designer
Bob Peterson
Contractor FLYWAY INC
Category
254 - Signs
Plan
Type
o Building
. Sign
o Canopy
Class of Const:
o Fence
o Raze
Zoning
Size
Unfinished/Basement
Sq. Ft.
Sq.Ft.
Sq. Ft.
Rooms
Height
Ft.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab o Pier o Other
o Concrete Block o Post o Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature Install 8 directional signs for City Center Businesses. These will be 7' tall and each have an area of 21.4 sq ft for a total of 170.88 sq ft.
of Work IAJI nonilluminated.
HV AC Contractor
Plumbing Contractor
Electric Contractor
$0.00 Permit Fee Paid
$74.00 Park Dedication
$0.00
Issued By:
Date 07/06/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0100600000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and t~urep~a~rovals before starting such activity. ~ ~
Signature / UI ru..a. I'-/. Date ~ b Ob
,
Agent/Owner
Address
N 5528 MIRANDA WAY
FOND DU LAC
WI 54937 - 0000
Telephone Number
920-921-7181
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.