HomeMy WebLinkAbout2006-Plumbing (interior & laterals)
o
OSHKOSH
ON THE WATER
Job Address 105 N SAWYER ST
CITY OF OSHKOSH
No
120365
PLUMBING PERMIT - APPLICATION AND RECORD
Contractor D.R. HANSEN PLBG.
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Shower
Water Softner
Floor Drain 2 Local Waste
2 Lndry Tray Clothes Wshr
2 Disposal Bidet
Dishwasher Beer Tap
Sump Pump Lab Sink
1 Classrm Sink Sterilizer
Breakrm Sink Dip Well
Ejector/Grind Drink Ftn
4 2-HOSE BIBB, 2-KETTLE FILLER
Owner DAUN BOCK LLC Create Date 06/19/2006
Category 440 - Industrial-Interior Plan G2-198-0606-P
Wait. St. Shamp Sink Coffee Maker 2
Ice Chest FlrlWst Sink 7 Int Grease Trap
Exam Sink Catch Basin 4 Ext Grease Trap
Sculry Sink 1 Wash Ftn RPZ Valve
Hand Sink 2 Urinal Eye Wash Statn
Plaster Sink Standp Ree Wtr Sewer Mtrs
Surgeons Sink lee Maker Deduct Meters
F Prep Sink 2 Gar Drain Wtr Usage Mtrs
Serv Sink 1 Soda Disp
Use/Nature NEW RESTAURANT "TACO JOHNS" INTERIOR & EXTERIOR PLUMBING.
of Work
Valuation
Issued By
Size
Sanitary Sewer
4"
Material
Plastic
#
Storm Sewer
8"
Type
Lateral
Conn. Type
New
Plastic
Lateral
2 New
Water Service
1-1/4"
Plastic
Lateral
New
Parcelld #
0607960000
$21,000.00 Plan Approval
$438.00 0 Permit Voided I
$0.00 Permit Fees
Date 07/05/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 55 KNAPP ST
OSHKOSH
WI 54902 - 0000 Telephone Number 233-1595
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.