Loading...
HomeMy WebLinkAbout0120378 B G OSHKOSH ON THE WATER Job Address 1522 OREGON ST CITY OF OSHKOSH No 120378 BUILDING PERMIT - APPLICATION AND RECORD Owner JENNIFER BAIER Create Date 06/30/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. D Projection I Finished/Living Sq. Ft. Sq.Ft. Bedrooms Stories Canopies Signs Garage Baths Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o / SFRllnstallation of a precast landing and steps. * The landing will be a maximum of 4'x6'. This work is to be done and inspected by September 6, 2006 to avoid citations. Use/Nature of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,000.00 Plan Approval Issued By: .u)~ $0.00 Permit Fee Paid $25.00 Park Dedication $0.00 Date 07/05/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0304970000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City.stronglY urges the permit applicant to contact the easemeh.l ;J "'- . /:-- holder(s) and to se ny necesscuy approvals fore rting,such activity. ~. ~ Signature Date 'tfl; Agent/Owner Address 15 OSHKOSH WI 54902 - 6920 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.