HomeMy WebLinkAbout0120350 P
e
OSHKOSH
ON THE WATER
Job Address 416 S MEADOW ST
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No 120350
Owner BRYAN/LEE ANN LILLY
Create Date 07/05/2006
Contractor J RASMUSSEN PLUMBING INC
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Category 411 - Residential-Water Heaters
Plan
Shower Water Softner Wait. St.
Floor Drain Local Waste Ice Chest
Lndry Tray Clothes Wshr Exam Sink
Disposal Bidet Sculry Sink
Dishwasher Beer Tap Hand Sink
Sump Pump Lab Sink Plaster Sink
1 Classrm Sink Sterilizer Surgeons Sink
Breakrm Sink Dip Well F Prep Sink
Ejector/Grind Drink Ftn Serv Sink
Shamp Sink
Flr/Wst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Gar Drain
Soda Disp
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
I
Use/Nature SFR / REPLACE POWER VENT WATER HEATER ""DEBT ACCT
of Work
Valuation
Size
Material
Sanitary Sewer
Storm Sewer
Water Service
Type
#
Conn. Type
$900.00
Plan Approval __ $0.00 Permit Fees
Parcelld #
0610440000
Issued By tYyrf LA.)
$25.00 D Permit Voided I
Date 07/05/2006
In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly ~rges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 1914 GREENBRIAR TRL
OSHKOSH
WI 54904 - 0000 Telephone Number 920-233-6747
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.