Loading...
HomeMy WebLinkAbout0120364-Building (window) e OSHKOSH ON THE WATER Job Address 2370 ALLERTON DR CITY OF OSHKOSH No 120364 BUILDING PERMIT - APPLICATION AND RECORD Owner MICHAEUCHERYL L PINNO Create Date 07/05/2006 Contractor BOB GRIFFIN CARPENTRY Designer Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Sq. Ft. Sq. Ft. Rooms Height Ft. o Projection I Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature SFRI Adding a Window* 32' X 60" in the bedroom. A 2X10 Header will be installed in the new wall opening on the gable end. of Work HV AC Contractor Plumbing Contractor Electric Contractor $300.00 Plan Approval $0.00 Permit Fee Paid $25.00 Park Dedication $0.00 Fees: Valuation Issued By: CfJ Date 07/05/2006 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 1318020000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure ar necessary ap' ovals before starting such activity. Signature' A;.....- . ~ Agent/Owner OSHKOSH Date 44-..>- -C) k Address 1955 SKYRANCH AVE WI 54904 - 0000 Telephone Number 235-4153 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.