Loading...
HomeMy WebLinkAbout0120321-Plumbing (water heater) o OSHKOSH ON THE WATER Job Address 2129 HAZEL ST CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 120321 Category 410 - Residential-Interior Owner SEAN BUTLER/DENISE ROBSON Create Date 06/28/2006 Contractor GARTMAN MECHANICAL Plan Shower Water Softner Wait. St. Floor Drain Local Waste Ice Chest Lndry Tray Clothes Wshr Exam Sink Disposal Bidet Sculry Sink Dishwasher Beer Tap Hand Sink Sump Pump Lab Sink Plaster Sink Classrm Sink Sterilizer Surgeons Sink Breakrm Sink Dip Well F Prep Sink Ejector/Grind Drink Ftn Serv Sink Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature PT # D / REPLACE GAS WATER HEATER "DEBT ACCT of Work Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Valuation Issued By Size Material Sanitary Sewer Storm Sewer Water Service Type # Conn. Type $600.00 C5YY\w $0.00 Permit Fees Parcelld # 1524020000 Plan Approval $20.00 D Permit Voided I Date 06/29/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 520 W SOUTH PARK AV Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number 920-231-5530 Date To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.