HomeMy WebLinkAbout0120321-Plumbing (water heater)
o
OSHKOSH
ON THE WATER
Job Address 2129 HAZEL ST
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No 120321
Category 410 - Residential-Interior
Owner SEAN BUTLER/DENISE ROBSON
Create Date 06/28/2006
Contractor GARTMAN MECHANICAL
Plan
Shower Water Softner Wait. St.
Floor Drain Local Waste Ice Chest
Lndry Tray Clothes Wshr Exam Sink
Disposal Bidet Sculry Sink
Dishwasher Beer Tap Hand Sink
Sump Pump Lab Sink Plaster Sink
Classrm Sink Sterilizer Surgeons Sink
Breakrm Sink Dip Well F Prep Sink
Ejector/Grind Drink Ftn Serv Sink
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature PT # D / REPLACE GAS WATER HEATER "DEBT ACCT
of Work
Shamp Sink
FlrlWst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Gar Drain
Soda Disp
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Valuation
Issued By
Size
Material
Sanitary Sewer
Storm Sewer
Water Service
Type
#
Conn. Type
$600.00
C5YY\w
$0.00
Permit Fees
Parcelld #
1524020000
Plan Approval
$20.00 D Permit Voided I
Date 06/29/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Address 520 W SOUTH PARK AV
Agent/Owner
OSHKOSH
WI 54902 - 0000 Telephone Number 920-231-5530
Date
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.