Loading...
HomeMy WebLinkAbout0120303-Plumbing o OSHKOSH ON THE WATER Job Address 1116 HAWK ST CITY OF OSHKOSH No 120303 PLUMBING PERMIT - APPLICATION AND RECORD Owner GLENN R HOUGE Create Date 06/13/2006 Plan Contractor KOCH PLUMBING Category 410 - Residential-Interior Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature SFR\ Remodelling kitchen-removing bearing wall-supporting load with code compliant header(Oshkosh Lumber) **DEBIT ACCT of Work Valuation Issued By Shower Water Softner 0 Floor Drain Local Waste Lndry Tray Clothes Wshr Disposal 1 Bidet Dishwasher 1 Beer Tap Sump Pump Lab Sink Classrm Sink Sterilizer Breakrm Sink Dip Well Ejector/Grind Drink Ftn Size Sanitary Sewer Storm Sewer Water Service Wait. St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Material $500.00 Plan Approval $0.00 Permit Fees $21.00 0 Permit Voided I Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Type # Conn. Type Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Parcelld # 1602210000 Date 06/29/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 2005 DOTY ST OSHKOSH WI 54902 - 0000 Telephone Number 920-231-6661 or 235 To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.