Loading...
HomeMy WebLinkAbout0120313-Plumbing (laterals) o OSHKOSH ON THE WATER Job Address 3131 ELK RIDGE DR Contractor 4 WAY CONSTRUCTION CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner MIDWEST GENERAL CONTRACTORS Category 430 - Industrial-Exterior (laterals) No 120313 Create Date 06/29/2006 Plan G2-194-0606-P Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature Install private main sewer and water and private lateral for 8-Unit Apartment/Condo and two storm sewers to private catchbasins on property of Work Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Softner Wait. St. Shamp Sink Local Waste Ice Chest FlrlWst Sink Clothes Wshr Exam Sink Catch Basin Bidet Sculry Sink Wash Ftn Beer Tap Hand Sink Urinal Lab Sink Plaster Sink Standp Rec Sterilizer Surgeons Sink Ice Maker Dip Well F Prep Sink Gar Drain Drink Ftn Serv Sink Soda Disp Coffee Maker Int Grease Trap 2 Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Valuation Sanitary Sewer Storm Sewer Water Service Size Material Plastic Plastic Type Main Lateral # Conn. Type New New $13,500.00 Plan Approval Parcelld # 8" 4" 12" 12" Plastic Plastic Lateral Lateral New New Issued By Date 06/29/2006 8" 2" Iron Plastic Main Lateral 1 New 1 New $0.00 Permit Fees $314.00 D Permit Voided I In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s and to secure ny nece approvals before starting such activity. Signature Date/:2 ?-(')({" Address P.O. BOX 133 WI 54923 - 0133 Telephone Number 920-361-1403 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.