HomeMy WebLinkAbout0120282-Plumbing (interior)
G
OSHKOSH
ON THE WATER
Job Address 3355 JACKSON ST
CITY OF OSHKOSH
No
120282
PLUMBING PERMIT - APPLICATION AND RECORD
Owner RAR INVESTMENTS LLC Create Date 06/0212006
Category 440 - Industrial-Interior . Plan G2-196-0606-P
Water Softner Wait. St. Shamp Sink Coffee Maker
3 Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Clothes Wshr Exam Sink Catch Basin 4 Ext Grease Trap
Bidet Sculry Sink Wash Ftn RPZ Valve
Beer Tap Hand Sink Urinal 3 Eye Wash Statn
Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Sterilizer Surgeons Sink Ice Maker Deduct Meters
Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn 2 Serv Sink Soda Disp
Contractor D.R. HANSEN PLBG.
Bathtub Shower
Whirlpool Floor Drain
Lavatory 5 Lndry Tray
Toilet 6 Disposal
Res. Sink 0 Dishwasher
Bar Sink Sump Pump
Water Heater 2 Classrm Sink
Site Drain Breakrm Sink
Roof Drain Ejector/Grind
Misc. 6 TRENCH DRAINS
Fixtures
Use/Nature
of Work
Interior plumbing for new car show room. **Debit Account
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcel Id #
1250180000
$30,000.00 Plan Approval
$0.00 Permit Fees
$231.00 0 Permit Voided I
Valuation
Issued By
Date 06/28/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 55 KNAPP ST
OSHKOSH
WI 54902 - 0000 Telephone Number 233-1595
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.