Loading...
HomeMy WebLinkAbout0120273-Building (remodel) e OSHKOSH ON THE WATER Job Address 500 S OAKWOOD RD CITY OF OSHKOSH No 120273 BUILDING PERMIT - APPLICATION AND RECORD Owner MERCY MEDICAL CENTER OSH INC Create Date 06/27/2006 Designer Cr Meyer - Pete Lecpmpte Contractor CR MEYER Category 220 - Alteration Hospitals & Institutions Plan U1-63-0606 Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: 2A Size Height Ft. o Projection I Unfinished/Basement Sq. Ft. Rooms Finished/Living ~ Sq.Ft. Sq.Ft. Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units o # Structures o Use/Nature Office / Suite 115/lnterior remodel as per HFS Approval Project # 4567-6766 granted on June 16, 2006. of Work HV AC Contractor Plumbing Contractor Electric Contractor 0.00 Plan Approval $0.00 Permit Fee Paid $124.00 Park Dedication $0.00 Issued By: Date 06/27/2006 Final/D.P. 00/00/0000 o Permit Voided I Parcel Id # 0613660000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any nece sary approvals before starting such activity. Signature I)v~ Date 0-)7~00 Agent/Owner Address 895 W 20TH AVE OSHKOSH WI 54902 - 0000 Telephone Number 920-235-3350 x219 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. . Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.