HomeMy WebLinkAbout06-226
JULY 11, 2006 06-226 RESOLUTION
(CARRIED___7-0___LOST________LAID OVER________WITHDRAWN________)
PURPOSE:APPROVE AMENDED AGREEMENT WITH AT&T / ANCHORAGE
BASIN PROJECT
INITIATED BY:DEPARTMENT OF PUBLIC WORKS
WHEREAS, by Resolution 05-292 adopted September 27, 2005, the common
council previously approved a contract with AT&T for relocation of fiber optic cable
required for the Anchorage Basin Storm Water Improvements project; and
WHEREAS, the Canadian National Railroad has determined that other construction
methods are required to preserve and protect its right-of-way, thereby requiring an
amended agreement with AT&T;
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh that the proper City officials are authorized and directed to enter into an
appropriate agreement that comports with the attached provisions and are further directed
to take those steps necessary to implement the terms and conditions of the Agreement
Money for this purpose is appropriate from:
Acct. No. 561-2010-1799-0000 – Storm Water Utility – Construction in Progress
June 29, 2006
Scope of Work
Appleton - Watertown Jet FT "A" Cable
City of Oshkosh Culvert Installation under CN Railroad
The Location:
This project is located along the CN Railroad in the city of Oshkosh, WI
The Work:
This work involves the installation of a new route approximately 3300 feet of length from an
existing splice location at Murdock road to a proposed splice location. Installation of new fiber
cable and completing a sheath opening splice. Contractor will be responsible to assist the AT&T
splicers during the cut over and installation and removal of a splice shack with needed shoring.
THE WORK WILL CONSIST OF THE FOLLOWING:
1. Directional boring and installing 350 feet of 4" SDR 11 HDPE duct with two 1.25" ducts
under the tracks, one road crossing and proposed culvert installation area.
2. Directional bore and plow two 1.25" ducts the remainder of the route from the splice point to
the proposed splice location.
3. Installation of3700 feet of new fiber cable.
4. At the proposed splice location expose 50 feet of cable, remove the duct from the cable and
construct a splice shack for the cut over.
5. After the cut over remove the splice shack and coil the new splice up and install a handhole of
the new splice.
6. Install AT&T cable warning tape, backfill and mechanically compact all excavated areas.
7. Clean up all disturbed areas along the route as good as or better condition.
NOTE: Extreme caution will be used when working around the
existing AT&T fiber cable and no work will be done in the
existing AT&T right-of-way with out a AT&T technician on
site.
NOTE: All work will be completed as per the AT&T Specifications
for Outside Plant Construction and Maintenance.
2
June 29, 2006
Cost Estimate
Appleton - Watertown Jet FT "A" Cable
City of Oshkosh Culvert Installation under CN Railroad
Engineering - Consultant:
1. Investigation, Engineering,
2. Construction Inspection
3. Travel and lodging
TOTAL $ 18,777.00
Construction Cost: (Including Materials)
1. Mobilization
2. Directional Bore 4" SDR 11 HDPE
3. Directional Bore two 1.25" SDR 11 HDPE
4. Plow two 1.25" SDR 11 HDPE
5. Install and Remove Shoring
6. Expose Fiber Cable
7. Install Fiber Cable
8. Install Handholes
9. Expose Splice Handhole
10. Remove duct from Fiber Cable
11. Construct Splice Shack
12. Relocate Marker Poles
TOT AL $ 53,025.00
AT&T Cost:
1. AT&T Technician
2. AT&T Engineer
3. AT&T Splice Crews for 2 PCI
4. 3700 Feet of 24 fiber Cable
TOTAL $ 32,300.00
3
CN Railroad Cost:
1. CN Railroad Flagman
TOTAL $ 15,000.00
TOTAL COST ESTIMATE:
1. Consultant
2. Construction
3. AT&T Cost
4. CN Railroad Cost
GRAND TOTAL $119.102.00