HomeMy WebLinkAbout0120271-Plumbing (added fixtures)
o
OSHKOSH
ON THE WATER
Job Address 2810 FOX TAIL LN
Contractor BARTELT PLUMBING
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
CITY OF OSHKOSH
No
120271
PLUMBING PERMIT - APPLICATION AND RECORD
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Owner JOHN E/JULlA R KIEFER Create Date 06/22/2006
Category 410 - Residential-Interior Plan
Water Softner Wait. St. Shamp Sink Coffee Maker
Local Waste Ice Chest FlrlWst Sink Int Grease Trap
2 Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
Bidet Sculry Sink Wash Ftn RPZ Valve
Beer Tap Hand Sink Urinal 1 Eye Wash Statn
-
Lab Sink Plaster Sink Standp Rec 1 Wtr Sewer Mtrs
Sterilizer Surgeons Sink Ice Maker Deduct Meters
Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn Serv Sink Soda Disp
WORK ADDED UNDER PERMIT #119969
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1332240000
$0.00 Permit Fees
$56.00 D Permit Voided I
Valuation $6,000.00 Plan Approval
Issued By ~ ~)
In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit appli tion within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to cur, /arJ, e ssa a provals before starting such activity.
, .. ,../
Signature
Date 06127/2006
. 6/P7~6
.
Date
Agent/Owner
Oshkosh
WI 54904 - 0000 Telephone Number 233-1670
Address 1420 FAIRFAX ST
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.