HomeMy WebLinkAbout2006-Building (foundation repair)
e
OSHKOSH
ON THE WATER
JobAddress 810VIOLAAVE
CITY OF OSHKOSH No 120249
BUILDING PERMIT - APPLICATION AND RECORD
Owner DOYLE R HUDSON Create Date 06/26/2006
Contractor SURE-DRY-BASEMENT SYSTEMS INC
Designer
Category
141 - Exterior Remodeling Plan
Type
. Building
o Sign
o Canopy o Fence o Raze
Class of Const: Size
Rooms Height Ft. D Projection I
-
Bedrooms Stories Canopies
-
Baths Signs
-
Zoning
Unfinished/Basement
Sq.Ft.
Sq. Ft.
Sq.Ft.
Finished/Living
Garage
Foundation . Poured Concrete 0 Floating Slab o Pier o Other
o Concrete Block o Post o Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFRI Repairing the North and East walls of the basement. The City of Oshkosh assumes no responsibilty for the design of the wall
of Work repair.
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$6,735.00 Plan Approval
~f1
$0.00 Permit Fee Paid
$56.00 Park Dedication
$0.00
Issued By:
Date 06/26/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1220700000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to securwy necessary approvals before starting such activity.
Signature ?"-- ~/~~~~. Date
Agent/Owner
-< ~/z6;0,.6
Address
754 W AIRPORT RD
MENASHA
WI 54952 - 1409
Telephone Number
920-967-9655
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.