Loading...
HomeMy WebLinkAbout2006-Building (foundation repair) e OSHKOSH ON THE WATER JobAddress 810VIOLAAVE CITY OF OSHKOSH No 120249 BUILDING PERMIT - APPLICATION AND RECORD Owner DOYLE R HUDSON Create Date 06/26/2006 Contractor SURE-DRY-BASEMENT SYSTEMS INC Designer Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Class of Const: Size Rooms Height Ft. D Projection I - Bedrooms Stories Canopies - Baths Signs - Zoning Unfinished/Basement Sq.Ft. Sq. Ft. Sq.Ft. Finished/Living Garage Foundation . Poured Concrete 0 Floating Slab o Pier o Other o Concrete Block o Post o Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFRI Repairing the North and East walls of the basement. The City of Oshkosh assumes no responsibilty for the design of the wall of Work repair. HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $6,735.00 Plan Approval ~f1 $0.00 Permit Fee Paid $56.00 Park Dedication $0.00 Issued By: Date 06/26/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1220700000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to securwy necessary approvals before starting such activity. Signature ?"-- ~/~~~~. Date Agent/Owner -< ~/z6;0,.6 Address 754 W AIRPORT RD MENASHA WI 54952 - 1409 Telephone Number 920-967-9655 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.