HomeMy WebLinkAbout0120241-Plumbing (laterals)
e
OSHKOSH
ON THE WATER
Job Address 580 S KOELLER ST
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner RIVER VALLEY ONE LLC
Contractor ZILLGES EXCAVATING
Category 430 - Industrial-Exterior (laterals)
Shower Water Softner Wait. St. Shamp Sink
Floor Drain Local Waste Ice Chest FlrlWst Sink
Lndry Tray Clothes Wshr Exam Sink Catch Basin
Disposal Bidet Sculry Sink Wash Ftn
Dishwasher Beer Tap Hand Sink Urinal
Sump Pump Lab Sink Plaster Sink Standp Rec
Classrm Sink Sterilizer Surgeons Sink Ice Maker
Breakrm Sink Dip Well F Prep Sink Gar Drain
Ejector/Grind Drink Ftn Serv Sink Soda Disp
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature 0" sanitary, 6" water, 12" and 15" storm laterals and 7 storm water catch basins for Golden Corral ""debit acct
of Work
No 120241
Create Date 06/26/2006
Plan G2-182-0406-P
Coffee Maker
Int Grease Trap
7 Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Size
Material
Plastic
Type
Lateral
#
Conn. Type
New
Sanitary Sewer
6"
Storm Sewer
12"
15"
Plastic
Plastic
Lateral
Lateral
New
New
Water Service
6"
Plastic
Lateral
New
Valuation
$26,000.00 Plan Approval
$0.00 Permit Fees
$249.00 D Permit Voided I
Parcelld #
0611620000
Issued By
Date 06/26/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 1800 FOUNTAIN AVE
OSHKOSH
WI 54904 - 0000 Telephone Number 376-1005
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.