HomeMy WebLinkAbout0120250-Building (basement window/sump pit
e
OSHKOSH
ON THE WATER
Job Address 915 BAUMAN ST
CITY OF OSHKOSH No 120250
BUILDING PERMIT - APPLICATION AND RECORD
Owner RICHARD A1L1SA A CZAJKA Create Date 06/26/2006
Contractor SURE-DRY-BASEMENT SYSTEMS INC
Designer
Category
141 - Exterior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
D Projection I
Canopies
Signs
Unfinished/Basement
Sq.Ft.
Sq.Ft.
Sq.Ft.
Rooms
Height Ft.
Finished/Living
Bedrooms
Stories
Garage
Baths
Foundation . Poured Concrete 0 Floating Slab o Pier o Other
o Concrete Block o Post o Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFRI Installing an egress window for the basement and installing a sump pit.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation $4,375.00 Plan Approval
Issuod By. ~
$0.00 Permit Fee Paid
$44.00 Park Dedication
$0.00
Date 06/26/2006
Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 1607170000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to see re any necessary approvals before starting such activity.
Signature --
Date
;< 0/~/tYh
Address 754 W AIRPORT RD
Agent/Owner
MENASHA
WI 54952 - 1409
Telephone Number
920-967-9655
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.