Loading...
HomeMy WebLinkAbout0120212-Building o OSHKOSH ON THE WATER Job Address 523 CEAPE AVE CITY OF OSHKOSH No 120212 BUILDING PERMIT - APPLICATION AND RECORD Owner THOMAS .C RECKER Create Date 06/23/2006 Designer Contractor OWNER Category 140 - Interior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Unfinished/Basement Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Pier o Other o Concrete Block o Post o Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFRI Remodeling the kitchen & laundry" to include gutting down to studs and replacing drywall. No structural work. of Work HV AC Contractor Plumbing Contractor HOMEOWNER Electric Contractor HOMEOWNER $5,000.00 Plan Approval $0.00 Permit Fee Paid Fees: Valuation $44.00 Park Dedication $0.00 Issued By: ~ Date 06/23/2006 FinaI/O.P. 00/00/0000 D . Permit Voided I Parcelld # 0801290000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit plicatio it in easement, the City strongly urges the permit applicant to contact the easement holder(s) and to se any ne s roval before starting such activity. Signature ~ Date X ~ -Z~~()rp ~ddress 523 CEAPE AVE Agent/Owner OSHKOSH WI 54901 - 5208 Telephone Number 426-4435 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.