Loading...
HomeMy WebLinkAbout0120191-Building (raze duplex) e OSHKOSH ON THE WATER Job Address 526 BROAD ST CITY OF OSHKOSH No 120191 BUILDING PERMIT. APPLICATION AND RECORD Owner BOYS AND GIRLS CLUB OF OSHKOSH INC Create Date 06/22/2006 Contractor FLUOR BROS CONSTRUCTION CO Designer Category 161 - Wrecking Residential Dwellings Plan Type o Building o Sign o Canopy Class of Const: o Fence . Raze Zoning Size Unfinished/Basement Sq. Ft. Rooms Height Ft. o Projection I Finished/Living Canopies Signs Sq.Ft. Sq. Ft. Bedrooms Stories Garage Baths Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature RAZE! Raze single family house. All material to be properly disposed of. of Work HV AC Contractor Plumbing Contractor Electric Contractor 0.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Issued By:- Date 06/22/2006 FinaIlO.P. 00/00/0000 o Permit Voided I Parcelld # 0404920000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and 0 secur an ,ne ssary approvals before starting such activity. Signature Date [0 -;)r;)- Address 203 OTTER AVE Agent/Owner OSHKOSH WI 54901 ~OOOO Telephone Number 231-6260 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.