Loading...
HomeMy WebLinkAbout0120184-Plumbing (fixtures) e OSHKOSH ON THE WATER Job Address 51 W 15TH AVE CITY OF OSHKOSH No 120184 PLUMBING PERMIT - APPLICATION AND RECORD Owner THOMAS R1E A SCHOENBERGER Create Date 06/21/2006 Plan Contractor KURT ZENTNER & SONS INC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Category 410 - Residential-I nterior Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Use/Nature DUPLEX-RENTAL I ADDITIONAL WORK TO PERMIT #120120 ALSO REPLACE KITCHEN SINK DRAIN, WASTE PIPING ""DEBT ACCT of Work Valuation Issued By Shower Water Softner Wait. St. Shamp Sink Floor Drain Local Waste Ice Chest FlrlWst Sink Lndry Tray Clothes Wshr Exam Sink Catch Basin Disposal Bidet Sculry Sink Wash Ftn Dishwasher Beer Tap Hand Sink Urinal Sump Pump Lab Sink Plaster Sink Standp Rec Classrm Sink Sterilizer Surgeons Sink Ice Maker Breakrm Sink Dip Well F Prep Sink Gar Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Size Material Type # Conn. Type Parcel Id # 0305070000 Date 06/22/2006 Sanitary Sewer Storm Sewer Water Service $1,000.00 Plan Approval $0.00 Permit Fees $20.00 D Permit Voided I In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 2860 OREGON ST OSHKOSH WI 54902 - 0000 Telephone Number 235-1340 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.