Loading...
HomeMy WebLinkAbout0120173-Plumbing (kitchen sink) o OSHKOSH ON THE WATER Job Address 802808 N MAIN ST Contractor KURT ZENTNER & SONS INC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work CITY OF OSHKOSH No 120173 PLUMBING PERMIT - APPLICATION AND RECORD Owner CHURCH ST JOHNS EVAN LUTH Create Date 05/01/2006 Category 440 - Industrial-Interior Plan Shower Water Softner Wait. St. Shamp Sink ~ Coffee Maker Floor Drain Local Waste Ice Chest FlrlWst Sink Int Grease Trap Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Disposal Bidet Sculry Sink Wash Ftn RPZ Valve Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Ejector/Grind Drink Ftn Serv Sink Soda Disp Church / Replace existing kitchen sink "DEBT ACCT Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1001080000 Plan Approval $0.00 $20.00 D Permit Voided I Permit Fees Valuation $1 WOO Issued By '()YY\ Date 06/21/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number 235-1340 Address 2860 OREGON ST To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.