HomeMy WebLinkAbout0120165 P VOID
cD
OSHKOSH
ON THE WATER
Job Address 1545 ARBORETUM DR
Contractor WATTERS PLUMBING
CITY OF OSHKOSH
No 120165
PLUMBING PERMIT - APPLICATION AND RECORD
VOl D
Owner ASSOCIATION RIVER MILL CONDO
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Shower
Floor Drain
2 Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
2 Water Softner
Local Waste
Clothes Wshr
Bidet
Beer Tap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
Create Date 06/21/2006
Category 410 - Residential-Interior
Plan
Wait. St.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Shamp Sink
FlrlWst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Gar Drain
Soda Disp
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
BATHROOM REMODEL UNIT #117 ""DEBIT ACCT
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
Valuation
Issued By
$5,600.00 Plan Approval
$0.00 Permit Fees
$28.00 ~ Permit Voided I
,.1;:,;
Date 06/21/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address PO BOX 118
MENASHA
WI 54952 - 0118 Telephone Number 920-733-8125
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.