HomeMy WebLinkAbout0120141-Building (excavate basement walls)
o
OSHKOSH
ON THE WATER
Job Address 1906 SIMPSON ST
CITY OF OSHKOSH No 120141
BUILDING PERMIT - APPLICATION AND RECORD
Owner NOELLE A NEUENS Create Date 06/20/2006
Contractor MJD FOUNDATION SOLUTIONS INC
Designer
Category
141 - Exterior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
D Projection I
Finished/Living
Sq. Ft.
Sq.Ft.
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
UselNature SFRI Excavating three basement walls, straightening and stabilizing with I Beams. *The contractor is responsible for the engineering and
of Work or the installation of the beams to provide a compliant repair.
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation )ly' $10,980.00
Issued By: \....
Plan Approval
$0.00 Permit Fee Paid
$79.00 Park Dedication
$0.00
Date 06/2012006
Final/D.P. 00/00/0000
D Permit Voided I
Parcelld # 1409750000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 2100 AMERICAN DR
NEENAH
WI 54956 - 0000
Telephone Number
734-8653
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless speCified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.