Loading...
HomeMy WebLinkAbout0120157 B e OSHKOSH ON THE WATER Job Address 1129 OTTER AVE CITY OF OSHKOSH No 120157 BUILDING PERMIT - APPLICATION AND RECORD Owner THOMAS C GAVIN Create Date 06/20/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. o Projection I Finished/Living Sq.Ft. Sq.Ft. Bedrooms Stories Canopies Garage Baths Signs Foundation 0 Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier . Other o Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature RES/ Replace 17 windows (double hung, same size as existing.) Replace siding - remove existing, install vinyl siding, 3/4" foam insul. of Work [board. Install aluminum overhang as needed, aluminum casings and sills. * Contractor is Custome Painting & Siding (Sc ott Sullivan.) HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuati $24,000.00 Plan Approval $0.00 Permit Fee Paid $136.00 Park Dedication $0.00 Issued By: Date 06/20/2006 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 0802530000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature ~ ~ Agent/Owner Date b I~D/D-t Address 1129 OTTER AVE OSHKOSH WI 54901 - 5448 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.