HomeMy WebLinkAbout0120157 B
e
OSHKOSH
ON THE WATER
Job Address 1129 OTTER AVE
CITY OF OSHKOSH No 120157
BUILDING PERMIT - APPLICATION AND RECORD
Owner THOMAS C GAVIN Create Date 06/20/2006
Designer
Contractor OWNER
Category
141 - Exterior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height Ft.
o Projection I
Finished/Living
Sq.Ft.
Sq.Ft.
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation 0 Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier . Other
o Treated Wood
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature RES/ Replace 17 windows (double hung, same size as existing.) Replace siding - remove existing, install vinyl siding, 3/4" foam insul.
of Work [board. Install aluminum overhang as needed, aluminum casings and sills. * Contractor is Custome Painting & Siding (Sc ott Sullivan.)
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuati
$24,000.00 Plan Approval
$0.00 Permit Fee Paid
$136.00 Park Dedication
$0.00
Issued By:
Date 06/20/2006
Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 0802530000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature ~ ~
Agent/Owner
Date
b I~D/D-t
Address
1129 OTTER AVE
OSHKOSH
WI 54901 - 5448
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.