Loading...
HomeMy WebLinkAbout0120158 B e OSHKOSH ON THE WATER Job Address 1847 OHIO ST CITY OF OSHKOSH No 120158 BUILDING PERMIT - APPLICATION AND RECORD Owner KEVIN S HEISLER Create Date 06/20/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Rooms Height Ft. o Projection I Finished/Living Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation o Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood . Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature Res/ Replace 8 windows, same size and style. Remove existing siding, install 1/2" foam board, vinyl siding, aluminum overhang, gutters of Work and spouts. HV AC Contractor Plumbing Contractor Electric Contractor Issued By: $6,000.00 Plan Approval $0.00 Permit Fee Paid $50.00 Park Dedication $0.00 Date 06/20/2006 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 1407740000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secur any n essary rovals before starting such activity. Date 6,..~ rt::?6 Signature Address 1847 OHIO ST Agent/Owner OSHKOSH WI 54902 - 6852 Telephone Number 2 (h> ~ 40 .7 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.