HomeMy WebLinkAbout2006-Building (alterations)
o
OSHKOSH
ON THE WATER
Job Address 421 N MAIN ST
CITY OF OSHKOSH No 120153
BUILDING PERMIT - APPLICATION AND RECORD
Owner 421 NORTH MAIN STREET LLC Create Date 06/20/2006
Designer
Contractor OWNER
Category
232 - Alteration Stores & Customer Service Plan T4-48-0506
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Sq.Ft.
Sq.Ft.
Sq.Ft.
Rooms
Height
Ft.
D Projection I
Unfinished/Basement
Finished/Living
Bedrooms
Stories
Canopies
Signs
Garage
Baths
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Required
Flood Plain No
Height Permit Not Required
Not Required
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature Store/Interior alterations as per plans. Plan approval granted subject to pending Variance revisions being approved by the State.
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
,000.00 Plan Approval
$0.00 Permit Fee Paid
$124.00 Park Dedication
$0.00
Issued By:
Date 06/20/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0700080000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and ~~ ~cure a~; necessary approv I before starting such activit>],
Signature .. f :'l ' L./
/ gent/Owner
Date ~
Address
5105 I AH MAYTAH RD
OSHKOSH
WI 54901 - 0000
Telephone Number
426-5956
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.