Loading...
HomeMy WebLinkAbout0120096-Building (re-side garage) G OSHKOSH ON THE WATER Job Address 1713 MOUNT VERNON ST CITY OF OSHKOSH No 120096 BUILDING PERMIT - APPLICATION AND RECORD Owner GERALDINE A HORTON Create Date 06/16/2006 Designer Contractor LUECKS HOME IMPROVEMENT INC Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Class of Const: Size Rooms Height Ft. o Projection I - Bedrooms Stories Canopies Baths Signs - Zoning Unfinished/Basement Sq.Ft. Sq.Ft. Finished/Living Garage Sq.Ft. Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature SFRlRe-sheet garage and put on new vinyl siding. No outside lights. of Work HV AC Contractor Plumbing Contractor Electric Contractor $6,300.00 Plan Approval $0.00 Permit Fee Paid $56.00 Park Dedication Fees: Valuation $0.00 Issued By: 0l4J Date 06/16/2006 Final/O.P. 00/00/0000 o Permit Voided I Parcel Id #.1504230000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 706 S MAIN STREET OSHKOSH WI 54902 - 6084 Telephone Number 235-0106 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.