Loading...
HomeMy WebLinkAbout0120092-Building (windows) G OSHKOSH ON THE WATER Job Address 2370 KINCAID AVE CITY OF OSHKOSH No 120092 BUILDING PERMIT - APPLICATION AND RECORD Owner LORI A HINZ Create Date 06/16/2006 Designer Contractor WASCO - WISCONSIN ALUMINUM SUPPLY C( Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. o Projection I Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Not Required Park Dedication Flood Plain Height Permit # Dwelling Units o # Structures o Use/Nature 'SFRlReplace 5 double hung windows in existing openings, all with exterior trim of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $2,375.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Issued By: 04-1 Date 06/16/2006 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 0613990600 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 2546 AMERICAN DR Agent/Owner APPLETON WI 54914 - 0000 Telephone Number 920-730-0099 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.