HomeMy WebLinkAbout0120088-Building (pool)
'.
OSHKOSH
ON THE WATER
Job Address 1102 BISMARCK AVE
CITY OF OSHKOSH No 120088
BUILDING PERMIT - APPLICATION AND RECORD
Owner SALLY A DOBBINS Create Date 06/16/2006
Designer
Contractor OWNER
Category
249 - Pools - Inflatable - Portable Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq.Ft.
Sq.Ft.
Sq. Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
Canopies
Bedrooms
Stories
Signs
Garage
Baths
Foundation
. Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit Not Required
Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature ISFRI LATE PERMIT/Installation of a 18' above grade inflatable pool with 48" side walls. *The location of the pool was approved per a
of Work /Jariance approved on 6/14/06 due to the pool not meeting minimum setback requirements.
Plumbing Contractor
HV AC Contractor
Electric Contractor
Fees: valuD
Issued By: h
-
$400.00 Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Date 06/16/2006
FinaI/O.P. 00/0010000
o Permit Voided I
Parcelld # 0607760100
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to $ re any necessary approvals efore starting such activity.
Signature
gent/Owner
OSHKOSH
Date 'f I' ".(4/0~
WI 54902 - 0000 Telephone Number
Address 1102 BISMARCK AVE
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.