HomeMy WebLinkAbout0120076-Building (fire damage)
e
OSHKOSH
ON THE WATER
Job Address 1422 ONTARIO ST
CITY OF OSHKOSH No 120076
BUILDING PERMIT - APPLICATION AND RECORD
Owner JOETTE S JOHNSON Create Date 06/15/2006
Designer
Contractor SULLI-CLAN INC
Category
140 -Interior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq.Ft.
Sq. Ft.
Rooms
Height
Ft.
\0 Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
Sq.Ft.
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use!Nature SFRI Fire Damage! Opening one wall in the kitchen, replacing kitchen cabinets, and replacing eight damaged floor joists in the basement.
of Work
HV AC Contractor
ANDERSON HVAC LLC
Plumbing Contractor WATTERS PLUMBING
Electric Contractor PACKERLAND ELECTRIC LLC
$35,000.00 Plan Approval
$0.00 Permit Fee Paid
$169.00 Park Dedication
$0.00
Issued By:
Date 06/15/2006
Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 1210290000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and[ to secure any necessary appro~ befo~e starti~h activity. / _ J
Slgnalu.. \ /J ~ ~ Date p "C/O/,
'-( . Agent/Owner
Address 3065 A COMMODITY LN GREEN BAY WI 54304 - 0000 Telephone Number 920-337-1986
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.