Loading...
HomeMy WebLinkAbout0120068-Plumbing . OSHKOSH ON THE WATER Job Address 3161 ELK RIDGE DR CITY OF OSHKOSH PLUMBING PERMIT --APPLICATION AND RECORD Owner MIDWEST GENERAL CONTRACTORS Category 440 - Industrial-Interior Contractor WATTERS PLUMBING 2 2 1 Shower Water Softner Wait. St. Shamp Sink Floor Drain 1 Local Waste Ice Chest FlrlWst Sink Lndry Tray 1 Clothes Wshr Exam Sink Catch Basin Disposal 1 Bidet Sculry Sink Wash Ftn - Dishwasher 1 Beer Tap Hand Sink Urinal Sump Pump Lab Sink Plaster Sink Standp Rec Classrm Sink Sterilizer Surgeons Sink Ice Maker Breakrm Sink Dip Well F Prep Sink Gar Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Hose Bibb Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. 2 Fixtures Use/Nature of Work No 120068 Create Date 05/18/2006 Plan Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Interior plumbing for club house **check 62749 Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # $0.00 Permit Fees $84.00 0 Permit Voided I Valuation _____ $5'454et) Plan Approval Issued By ~ Date 06/15/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address PO BOX 118 MENASHA WI 54952 - 0118 Telephone Number 920-733-8125 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.