HomeMy WebLinkAbout0120070-Plumbing
o
OSHKOSH
ON THE WATER
Job Address 3101 ELKRIDGE DR
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner MIDWEST GENERAL CONTRACTORS
Contractor WATTERS PLUMBING
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Category 440 - Industrial-Interior
No 120070
Create Date 05/18/2006
Plan G2-192-0606-P
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
6 Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
IS-UNIT CONDO/APARTMENT INTERIOR PLUMBING **check 62749
.
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
6 Shower 6 Water Softner Wait. St. Shamp Sink
Floor Drain 12 Local Waste Ice Chest FlrlWst Sink
6 Lndry Tray Clothes Wshr 6 Exam Sink Catch Basin
6 Disposal 6 Bidet Sculry Sink Wash Ftn
Dishwasher 6 Beer Tap Hand Sink Urinal
Sump Pump Lab Sink Plaster Sink Standp Ree
6 Classrm Sink Sterilizer Surgeons Sink Ice Maker
0 Breakrm Sink Dip Well F Prep Sink Gar Drain
Ejector/Grind Drink Ftn Serv Sink Soda Disp
3 HOSE BIBB
$0.00 Permit Fees
$483.00 D Permit Voided I
Valuation $21 ,o~ Plan Approval
Issued BY<{)Yn
Date 06/15/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address PO BOX 118
MENASHA
WI 54952 - 0118 Telephone Number 920-733-8125
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.