Loading...
HomeMy WebLinkAbout0120074-Building o OSHKOSH ON THE WATER Job Address 31-39 BOWEN ST CITY OF OSHKOSH No 120074 BUILDING PERMIT - APPLICATION AND RECORD Owner HOMESTEAD CONDOMINIUMS Create Date 06/15/2006 Contractor BADGER EXCAVATING LLC Designer Category 285 - Wrecking (Industrial & Commercial Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. o Projection I FinishedlLiving Sq.Ft. Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature L;ONDO/ Raze the site at 35, 37 and 39 Bowen 51. The existing sprinkler riser ace. building shall also be razed after utilities have been of Work bandoned. HV AC Contractor Plumbing Contractor Electric Contractor ~'6'OOO'OO Plan Approval $0.00 Permit Fee Paid $104.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 06/15/2006 Final/O.P. 00/00/0000 o Permit Voided' Parcel Id # In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. -----.. Signature x.. l~ ~ Date x~-/S - 0 t.? Agent/Owner Address PO BOX 584 GREEN LAKE WI 54941 - 0000 Telephone Number 920-294-6212 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless speCified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.